WhatsApp us0143 000 888
Search by model, capacity or product type
Try:

Home / FAQs / Installation, site surveys & commissioning
FELICITY SOLAR KENYA · FAQs

Installation, site surveys & commissioning

Plan a complete installation, confirm survey charges and prepare for commissioning or expansion.

Do you provide solar installation in Kenya?

This website identifies Taico Kenya as our installation and managing company.

Enquire on WhatsAppLink to this answer

How much does a solar site survey cost?

The website lists KSh 5,000 for a site survey within Nairobi and its environs.

Enquire on WhatsAppLink to this answer

Why do I need a site survey before installing solar?

A survey helps verify loads, mounting space, roof conditions, shading, cable routes and installation requirements.

Enquire on WhatsAppLink to this answer

Can I send my site location from the website?

Use the site-survey form and its location options to share the site details.

Enquire on WhatsAppLink to this answer

What should I prepare for a solar quotation?

Prepare an appliance list with quantities, power ratings and operating hours; your location; electrical phase; backup hours; and any existing equipment models.

Enquire on WhatsAppLink to this answer

What is solar system commissioning?

Commissioning checks the installed equipment, configuration and operation before handover.

Enquire on WhatsAppLink to this answer

Can you install or commission equipment I already own?

You can submit an installation or commissioning enquiry for existing equipment.

Enquire on WhatsAppLink to this answer

How long does solar installation take?

The schedule depends on system size, site readiness, equipment availability, access, mounting and the agreed scope.

Enquire on WhatsAppLink to this answer

Is the website solar calculator a final engineering design?

Reviewed 20 October 2026 · All questions

Privacy & official contact guidance